ETT Study Guide Book 1: Safety
G. Switching and Temporary Protective Grounding
1. Voltage Detection 2, 3, 4
Select and apply correct voltage detection equipment.
- Safety Considerations for Live Electrical Measurements
- D. Personal Protective Equipment - Voltage Detectors
2. Protective Grounds 2, 3, 4
Apply correct temporary protective grounding equipment. 2
Select and Apply correct temporary protective grounding equipment. 3, 4
Important Standards
- ASTM F855 Standard Specifications for Temporary Protective Grounds to Be Used on De-energized Electric Power Lines and Equipment 3
- OSHA 1926.962 Grounding for the protection of employees
3. System switching 2, 3, 4
Interpret and apply system switching procedures
- OSHA Letter of Interpretation, Dec 6, 1999 3
- Considerations When Switching Capacitor Banks
- It's not Dead till you Prove it's Dead!!!
- Safely discharge HV feeder using load break disconnect switch (procedure)
Last Update: Feb 02, 2025
🔌 Join our vibrant knowledge sharing hub for electrical test technicians and maintenance professionals worldwide! At TestGuy, we're dedicated to empowering individuals in the field, providing valuable resources, and fostering discussions to elevate the standards of electrical testing practices. Join us and expand your expertise!
Guide Table of Contents, Book 1