ETT Study Guide Book 1: Safety
G. Switching and Temporary Protective Grounding
1. Voltage Detection 2, 3, 4
Select and apply correct voltage detection equipment.
- Safety Considerations for Live Electrical Measurements
- D. Personal Protective Equipment - Voltage Detectors
2. Protective Grounds 2, 3, 4
Apply correct temporary protective grounding equipment. 2
Select and Apply correct temporary protective grounding equipment. 3, 4
Important Standards
- ASTM F855 Standard Specifications for Temporary Protective Grounds to Be Used on De-energized Electric Power Lines and Equipment 3
- OSHA 1926.962 Grounding for the protection of employees
3. System switching 2, 3, 4
Interpret and apply system switching procedures
- OSHA Letter of Interpretation, Dec 6, 1999 3
- Considerations When Switching Capacitor Banks
- It's not Dead till you Prove it's Dead!!!
- Safely discharge HV feeder using load break disconnect switch (procedure)
Last Update: Aug 21, 2023
🔍 Looking for a platform to connect with experienced professionals and expand your understanding of electrical testing and maintenance? TestGuy is here for you! Join our knowledge sharing hub, engage in insightful conversations, and access valuable resources that will empower you to excel in your field. Join the conversation!
Guide Table of Contents, Book 1