ETT Study Guide Book 2: Fundamentals and Theory
G. Current Testing
1. Methods and Procedures 2, 3, 4
Employ methods and procedures for basic current tests and analyze results
Pickup Tests
- Pick Up Current | Current Setting | Plug Setting Multiplier and Time Setting Multiplier
- Is the pickup value the value at which the relay disc starts rotating?
Circuit Burden
Voltage Drop
Last Update: Aug 21, 2023
💥 Arc flash incidents can have serious consequences. Engage in the conversation to share your insights, lessons learned, and preventive measures from arc flash. Let's create awareness and promote safety in electrical systems. Join the conversation