ETT Study Guide Book 4: Systems and Commissioning
B. SCADA
1. System Requirements
Recognize requirements, equipment, and configuration of SCADA/DCS systems 3, 4
Basic Requirements 3
Advanced Requirements 4
Important Standards
- IEEE C37.1 Standard for SCADA and Automation Systems 3 4
- IEC 61850 Communication Networks and Systems In Substations: An Overview for Users 4
- IEC 61850-6 Configuration language for communication in electrical substations related to IEDs 4
IEC 61850
- 6 steps for specifying IEC 61850 & substation automation requirements
- IEC 61850 standard application examples of substation automation
- Implementation of IEC 61850 in power substation environment
- The importance of IEC 61850 in relation to the smart grid
SCADA Systems
- Purpose And Applicable Processes Of a SCADA System
- The basics of supervisory control and data acquisition (SCADA)
- The Basics of Hardware and Software for SCADA Systems
- 5 ingredients that make SCADA operation delicious
- Implementation Of SCADA System For Controlling And Monitoring 132/33/11 kV Substation
- An Old-School Approach to Implementing SCADA into the Municipal Environment
- Methods of Time Synchronization
Power Line Carrier (PLC) Systems
- Power Line Carrier Communication (PLCC)
- Power Line Carrier Communication (PLCC)
- Powerline carrier (PLC) communication systems in T&D
- High-frequency Line Trap Basics
- Line traps for system voltages up to 800kV
- Power line carrier channel (PLCC) and application of transmission line relaying
- The Transition from Power-Line Carrier
- New Power Line Carrier System for Digital High-Voltage Substations
Last Update: Feb 02, 2025